Setting up [Date Verification]

Follow the steps below to set up [Date Verification].
Date Verification - Operation FlowDate parameter Code parameter Output parameter Verification
Note
Operations of the ProcItem Setting window
  1. In the Edit Flow window, tap [Date Verification].
    The ProcItem Setting window is displayed.
  2. In the "Item tab" area, tap [Verification] and set the parameters for the verification string.
  3. In the "Item tab" area, tap [Date parameter] and set the date /time to be compared.
  4. In the "Item tab" area, tap [Code parameter] and set the code parameter.
  5. Tap [OK].
    After confirmation, the ProcItem Setting window will be closed.
  6. Perform a test measurement.
  7. Verify measurement results.
    When "NG" is displayed, verify measurement results and make adjustments if necessary.