Settings Flow (Date Verification)

Follow the steps below to set up [Date Verification].
Date Verification - Operation flowDate parameterCode parameterOutput parameterVerification

List of Date Verification Items

Item name
Description
Verification
This item sets parameters of the verification string.
Verification Parameters (Date Verification)
Date parameter
This item sets the date/time format and update conditions.
Date Parameters (Date Verification)
Code parameter
Set this to print the date encrypted in such a way that it is difficult for the user to recognize.Setting what codes show also makes possible automatic updating.
Code Parameters (Date Verification)
Output parameter
This item can be changed if necessary.Normally, the factory default value will be used.
Use the output parameter to specify how to handle the coordinates.
Output Parameters (Date Verification)